BDS & NETWORK TIMELINE
April 2009: Cabling begins at the end of the month
May 2009: Cabling is complete, switches are installed, phone system is brought on-line, tested & staff are trained
June 2009: Master Control & the Main studio control room are disassembled, re-installed, and new equipment systems are brought on-line
July 2009: The Mini studio is disassembled and re-installed. The Micro studio is installed with new equipment systems. The Equipment Room and Dub Station are brought on-line. The Final Cut editing suites are brought on-line.
August 2009: All systems are tested, documented and staff is trained on the new network systems and equipment.
The projected completion date is August 10th.